Stop starting,
start finishing.

A hand moving a blank pale blue paper note between columns of pastel notes on a whiteboard divided by strips of tape
AI-generated image, not a photograph of a real person or place.

One note per job. Three columns. A limit.

A sticky-note board shows what is waiting, what is under way and what is done, so everyone can see the work at a glance. The useful part is the limit: only so many notes are allowed in the middle column at once.

TO DO · DOING · DONEone note per jobUpdated

Read your board

01Principles

  • Make the work visible
  • Cap what is in progress
  • Pull, don't push
  • Fewer jobs open, more jobs done

02THE SHORT ANSWER

Three columns,
one rule.

The board shows the work.
The limit on the middle column does the rest.

VISUALISE

One note, one job

Write each piece of work on its own note and move it from To do to Doing to Done. The board becomes a shared picture of the work that anyone can read.

Read your board

LIMIT

Cap the middle column

The Kanban Guide says teams must explicitly control how many items are started but not finished, and start a new one only when there is room.

Why it helps

MEET

Talk at the board

UK government guidance suggests a daily stand-up of 15 minutes or less, at the same time each day, to talk about the work and anything that is stuck.

Set one up

03A QUICK BOARD CHECK

What is your board
telling you?

Pick what you see in the middle of your board. The bar shows how strongly the flow guidance points to doing something about it.

Based on The Kanban Guide (May 2025) and Little's Law as described by MIT. General information about organising work.

Board check

Choose what you see
Doing is below its limitPull the next note

The Kanban Guide treats work in progress dropping below the agreed limit as the signal that there is capacity to start something new.

Doing is exactly at its limitFinish first

The board is full. Under a pull system, nobody starts another note until one already under way moves to Done.

Doing is far over the limitStop starting

Little's Law links the number of items in a system to how fast they finish and how long each one spends inside. Finish at the same rate with more notes open, and each note waits longer on average.

A note hasn't moved for weeksCheck its age

Work item age is one of the guide's four core measures. An old note in Doing is often blocked: unblocking it is part of managing the board.

Nobody agrees when a note is doneDefine done

The guide asks teams to agree when an item counts as started and when it counts as finished, so a note's move to Done means the same to everyone.

Sources: The Kanban Guide (Vacanti and Coleman, May 2025); MIT News on John Little and Little's Law (2024).

04TWO NUMBERS WORTH KNOWING

Juggling costs time,
and parts must flow.

One figure on switching between jobs,
one on the factory problem the card idea grew from.

≈ 40%

Productive time lost to switching, at most

The American Psychological Association reports psychologist David Meyer's view that brief mental blocks from shifting between tasks can cost as much as 40 percent of someone's productive time. Fewer open jobs means fewer switches.

SWITCHING · APA

30,000+ parts

Parts in one car, all needing to arrive in step

The Japanese car-making system that inspired kanban had to coordinate more than 30,000 parts per car, making only what is needed, when it is needed and in the amount needed.

JUST-IN-TIME · CAR MAKING

John Little published Little's Law in 1961. MIT describes it as L = λW: the number in a system equals the arrival rate multiplied by the average time each item spends there.

05FOUR STEPS TO A FIRST BOARD

A wall, a pad
and a limit.

You need a wall, a whiteboard or a large sheet of paper, a pad of notes and a thick pen. The rules matter more than the kit.

  1. Draw three columns

    To do, Doing and Done is enough to start. Add a column later only if a stage keeps hiding work, such as waiting for a reply.

  2. One job per note

    Write a short verb-first task on each note, big enough to read from a step back. Put them in To do in order of priority.

  3. Set a number for Doing

    Pick a limit for the middle column, write it at the top and stick to it. Start a new note only when one moves to Done.

  4. Look at it together

    Meet at the board briefly at the same time each day: what moved, what is stuck and what to pull next.

A small team seen from behind, standing at a wall of pastel paper notes for a short morning meeting
AI-generated image, not a photograph of a real person or place.

06WHERE THE CARDS CAME FROM

From the factory
to the office wall.

A hand peeling a blank pale green square note from a small pad on a wooden desk, a mug out of focus behind
AI-generated image, not a photograph of a real person or place.

Card-based kanban has its roots in a Japanese car maker's production system, built around making only what is needed, when it is needed and in the amount needed, so that parts are pulled through the line rather than piled up.

Office teams adapted the idea for knowledge work: The Kanban Guide says the practices now called Kanban mainly took shape on one software team in 2006. UK government guidance lists Kanban among the three most popular agile methods.

07Questions

Questions people ask

What is a kanban board?

It is a board that shows work as cards or notes moving through stages, often To do, Doing and Done. The Kanban Guide calls it the visual form of a team's agreed workflow.

Why limit the number of notes in Doing?

Controlling work in progress creates a pull system: you start a new item only when there is capacity. The guide says this helps flow and often improves the team's focus and collaboration.

What is Little's Law?

A result published by MIT's John Little in 1961. It states that the number of items in a system equals their arrival rate multiplied by the average time they spend in it, and it applies from factories to health care.

Does this only work for software teams?

No. The Kanban Guide says the approach is not limited to one industry, has been used in finance, utilities, health care and software, and can be used at any scale.

Paper notes or a digital board?

Either. UK government guidance says a team wall can be a physical wall or a digital board for remote teams. What matters is that everyone can see what is done, under way and still to do.

08Sources